dt spaghetti bridge assesment
Tuesday, 2 April 2013
this is the triangle for the bottom of the spegehtti bridge
day 8 P2 3/4/13
Today i started the first design the group design looks like this:
The Fantastic Four Design Idea
This is what the string looks when the string is attached:
Atached String To Bottom Of The Bridge
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)