Tuesday, 2 April 2013

this is the triangle for the bottom of the spegehtti bridge

day 8 P2 3/4/13

Today i started the first design the group design looks like this:

The Fantastic Four Design Idea
 This is what the string looks when the string is attached:

Atached String To Bottom Of The Bridge